Local trains on harbour line affected following cracks

Crack in the railway tracks on Vashi Bridge affected the trains running from Mankhurd towards Vashi.

 The fault took place around 8.30 am. Due to this line sat harbour line was affected for around an hour. 

The crack was repaired by 9.30 am after which railway service was on track gradually. Even now the trains on harbour line are running 30 minutes late.

More News